Calling for entries from companies and consortia interested in undertaking a study for the OWA Logistics and O&M Technical Working Group (TWG-L) that will investigate transition piece (TP) optimisation in context to O&M and the potential design standardisation.
The main objectives of this work are to:
- Review the transition piece platform design in context to O&M operations and access methods.
- Identify the main design requirements for personnel access including different types of access systems, material handling, electric charger interfaces and drone operations.
- Develop a standardised TP platform design detailing O&M requirements for the future turbine platforms.
The expected benefits of this work are that it will allow for a better understanding of the specific requirements for TP design in context to O&M operations.
The deadline for clarification questions was 14 July 17:00 BST. Clarification question responses can be found below.
The closing date to receive tender submissions is 1 September 12:00 BST.
All clarification questions and tender submissions should be sent electronically, by their respective deadlines to alistair.morris@carbontrust.com with arturo.andersen@carbontrust.com in copy.