Floating Wind Joint Industry Programme: Fixed-to-floating Wind Turbine Generator Integration Requirements (WTG-I)

Calling for entries from companies and consortia interested in undertaking a study to develop guidelines for feasible WTG integration onto floating substructures.

The objectives of the project are to:

  • Define a tolerance range and limiting factors for the safe integration of fixed-to-floating wind turbine generators (WTGs).
  •  Engage with key stakeholders (turbine OEMs or 3rd party specialists) to understand risks and mitigation factors for the proposed tolerances and collaboratively agree on tolerances.
  • Develop a guidance document for fixed-to-floating WTG integration at quayside, outlining the conditions and parameters where it is feasible to carry out WTG integration procedures.

The deadline for clarification questions is 20 February 2024.

The closing date to receive tender submissions is 22 March 2024.

All clarification questions and tender submissions should be sent electronically, by their respective deadlines to Mary.Harvey@carbontrust.com, with floatingwind@carbontrust.com in copy.